Home

Projects

ACT Health Upgrade

ACT Health Upgrade

INDUSTRY
Health
The ACT Health Upgrade project at 26 Bowes St, Canberra, involved a comprehensive building refurbishment. Contemporary Plumbing expertly managed the installation of hot and cold water reticulation systems and rising waste mains to enhance the property's overall water pressure, distribution efficiency, and waste management capacity.
Services Provided
Our team of Canberra plumbing experts completed a comprehensive building refurbishment project that involved extensive plumbing work, including both hot and cold water reticulation and the installation of rising mains for waste management.
HOW CAN WE Help?
Speak to Our team
About Us
Call Contemporary Plumbing on 02 6292 8175
CALL US
CALL US:

Hot and Cold Water Reticulation

One of the critical aspects of this project was the reticulation of hot and cold water throughout the building. Our team ensured the water distribution system was efficiently designed to provide consistent water pressure and temperature control across all units. This involved:

  • Designing a reticulation system that meets the building’s needs.
  • Installing high-quality pipes and fittings to ensure durability and reliability.
  • Testing the system extensively to prevent leaks and ensure optimal performance.
Contemporary Plumbing team member in company uniform

Your Reliable Trusted 
 Local Plumbing Team

Installation of Rising Mains for Waste

Another vital component of the refurbishment was the installation of rising mains for waste. This system is crucial for managing the building’s sewage and wastewater efficiently. Our approach included:

  • Assessing the building’s existing waste management system to identify areas for improvement.
  • Designing and installing a robust, rising main system to handle the increased load from the refurbished building.
  • Ensuring compliance with all relevant building codes and regulations to guarantee the system’s safety and effectiveness.

Canberra’s Most Go-To  Plumbing Team

300+​

years combined
experience

45+​

TEAM MEMBERS

2K+

JOBS COMPLETED

900+​

PROPErties serviced

Challenges and Solutions

Challenge: Limited access to certain areas of the building due to ongoing construction work.

Solution: Our team coordinated closely with other contractors to schedule our work during optimal times, minimising disruptions and ensuring seamless integration of our plumbing systems.

Challenge: Ensuring the new systems could handle the increased demand from additional units.

Solution: We conducted thorough load assessments and utilised advanced materials and technologies to enhance the capacity and efficiency of both the water and waste drainage systems.

Project Outcome

The refurbishment at 2 – 6 Bowes St was completed successfully, with the new plumbing systems significantly enhancing the building’s functionality and comfort. The hot and cold water reticulation provides residents with reliable access to water, while the rising waste mains ensure efficient and hygienic waste management.

Our commitment to quality and precision in this project reflects our dedication to delivering top-tier plumbing solutions for our clients.

Client:
ACT Health
Licensed Master Plumbers
Contemporary Plumbing workmanship guarantee

Some Of
Our Clients

4.9
Contemporary Plumbing team standing in front of their service vehicles

Ready To Get
Started?

Get In Touch

What Sets Us Apart