ACT health Building

ACT HEALTH UPGRADE

Sector: Health

At Contemporary Plumbing, we completed a comprehensive building refurbishment project at 2 – 6 Bowes St, Canberra. This project involved extensive plumbing work, including both hot and cold water reticulation and the installation of rising mains for waste management.

Project Details

Location: 2 – 6 Bowes St, Canberra

Scope of Work: Building refurbishment, plumbing system overhaul

Services Provided:

  • Hot and Cold Water Reticulation
  • Installation of Rising Mains for Waste

Hot and Cold Water Reticulation

One of the critical aspects of this project was the reticulation of hot and cold water throughout the building. Our team ensured the water distribution system was efficiently designed to provide consistent water pressure and temperature control across all units. This involved:

  • Designing a reticulation system that meets the building’s needs.
  • Installing high-quality pipes and fittings to ensure durability and reliability.
  • Testing the system extensively to prevent leaks and ensure optimal performance.

Installation of Rising Mains for Waste

Another vital component of the refurbishment was the installation of rising mains for waste. This system is crucial for managing the building’s sewage and wastewater efficiently. Our approach included:

  • Assessing the building’s existing waste management system to identify areas for improvement.
  • Designing and installing a robust, rising main system to handle the increased load from the refurbished building.
  • Ensuring compliance with all relevant building codes and regulations to guarantee the system’s safety and effectiveness.

Challenges and Solutions

Challenge: Limited access to certain areas of the building due to ongoing construction work.

Solution: Our team coordinated closely with other contractors to schedule our work during optimal times, minimizing disruptions and ensuring seamless integration of our plumbing systems.

Challenge: Ensuring the new systems could handle the increased demand from additional units.

Solution: We conducted thorough load assessments and utilised advanced materials and technologies to enhance the capacity and efficiency of both the water and waste drainage systems.

Project Outcome

The refurbishment at 2 – 6 Bowes St was completed successfully, with the new plumbing systems significantly enhancing the building’s functionality and comfort. The hot and cold water reticulation provides residents with reliable access to water, while the rising waste mains ensure efficient and hygienic waste management.

Our commitment to quality and precision in this project reflects our dedication to delivering top-tier plumbing solutions for our clients. For any inquiries or further details about this project or our services, please feel free to contact us at Contemporary Plumbing.

Online Booking

For emergency work (Saturday/Sunday/Out of hours) please ring 02 6292 8175 for an immediate response.

Call Now Button