Parliament House - Main Production Kitchen Upgrade

Client: ISIS Group Australia

Contemporary Plumbing installed and altered hydraulic works to suit the new layout of MPK at Parliament House.
The in- ground component of the project included the installation of HDPE drainage lines to withstand the high temperature waste the MPK would be disposing. This included the cutting, removal and reinstatement of concrete.
An upgraded Hot water reticulation line was installed to meet the required demands of the kitchen.
An ‘e-Water’ system was installed which included Sanitising and Cleaning water outlets at all sinks and hand basins.
Work was completed on-time, on-budget and with zero defects.

 

 

 

Canberra Dialysis Centre

Client: IQON Pty Ltd

Works included the installation of a new hot and cold water reticulation system as well as the installation of a Reverse Osmosis system required by the Dialysis Clinic. New core holes and drainage points were required to supply the new layout. TMV's and Back-flow prevention valves were installed to maintain compliance with Local and Australian standards

 

 Canberra Dialysis Clinic

Point Project Management  Office Fit-out 

Client: Point PM and SMI Group Pty Ltd

Contemporary Plumbing installed new hydraulic services for the Point PM office relocation which included installation of pump systems and rising mains to achieve the desired fit out requirements. All works were completed with highest level of attention to detail as required.

 

Point Project Management

Batemans Bay BB39 & BB34 Sewer Pump Station Upgrades

Client: IQON Pty Ltd

Hydraulic and Civil works were required and included excavation for the installation of 2 new 30,000L emergency over-flow tanks and installation of large diameter concrete reinforced drainage lines. Spear jets were required to perform the excavation work due to the proximity of the site to water. Contemporary Plumbing worked with the client and local authorities to solve issues related to maintaining the use of sewer services whilst upgrades were performed to the wet wells. 

 

 Emergency Overflow Tank

Guardian Early Leaning Centre

Client: Renascent Australia

Works included cutting, removal and reinstatement of concrete for the installation of new drainage services. Installation of a new Grease Interceptor Trap and HDPE trade waste lines to serve the commercial kitchen. New hot water manifolds and ring mains were installed as well as plumbing services to 4 x new bathrooms, canteens, laundries and kitchenette areas. 

 Guardian Early Learning Centre


ACT Health Directorate Upgrade

Head Contractor: IQON Pty Ltd

Contemporary Plumbing upgraded the existing Hydraulic fixtures to 4 levels of Male, Female and Accessible bathrooms. New Thermostatic Mixing Valves were installed to bring the building in line with current regulations.
All work was completed on-time, on-budget and with zero defects.

 

 
 

Charles Sturt University—Various Projects

Client: SMI Group Pty Ltd

Contemporary Plumbing provide hydraulic works to both CSU sites on Brisbane Avenue, and the Wagga School Campus.
Works included the installation of pumped drainage to lines to allow for hydraulic fixtures in places were drainage services would be otherwise un-feasible to connect to.
Installation of Hot water reticulation lines to serve new bathrooms at the School of Dentistry.
Cutting, removal and reinstatement of concrete for new drainage layouts.
All work was completed on-time, on-budget and with zero defects.

 

 


Springbank Rise Multi-unit development 

Client: Rojas Constructions Pty Ltd

Contemporary Plumbing are currently undertaking works on a multi-unit residential housing development at Springbank Rise including the installation of plumbing, drainage and gas services to new units.

 

 


Airservices Australia

Client: ISIS Group Australia

Contemporary Plumbing designed and constructed new hydraulic services for the installation of additional fixtures. Works included the installation of new fixtures with connection to existing water and drainage services including concrete cutting and coring as required, the installation of new Hot water systems and supply lines, and the refurbishment to existing bathrooms on-site.
All work was completed on-time, on-budget and with zero defects.

 

 


Vikings Club Erindale

Client: IQON Pty Ltd

Works include the installation of new pumped drainage systems for the redevelopment of the Sports bar and VP3 areas, as well as the relocation of Fire Hydrants and Fire Hose reels to bring the building into line with current Australian Standards.

 

 


Hanaichi Canberra Centre

Client: Project Shopfit Pty Ltd

Contemporary Plumbing installed new water and gas supply lines to Hanaichi. High temperature water was needed as well as HDPE drainage and Emergency Gas shut off valves to meet the demands of the shop and local regulations.


  

 

 

 